Your ERP tracks the gold. XAU Design tells each bench how to make it.
Write a design's instructions once, one sheet per department. When an order reaches the floor, the caster sees casting, the setter sees setting, and nobody works from a supervisor's memory. Every stage is signed off, weighed and logged.
- One instruction sheet per department
- Critical steps block sign-off
- Weight & loss recorded per stage
- Connects to Gold ERP
- Check the wax tree against BNG-2210 rev 3
- Record weight in before casting
- Quench only after 20 minutes of air cooling - early quench cracks the hingecritical
- Record weight out and scrap
The know-how that makes a piece lives on paper and in people's heads.
Your ERP tracks items, orders, karigars and gold weight. It doesn't tell the caster what temperature this bangle needs, or warn the polisher not to machine-polish across a kundan stone. That knowledge sits in a notebook, or with one supervisor.
When it's missing, pieces come back for rework. When metal goes missing, nobody can say which stage lost it. XAU Design is the layer between the order and the bench.
From design to dispatch, one department at a time.
- 01
Write the design
Karat, colour, gross and net weight, allowed wastage, sizes, a table of stones and specs such as hinge type or wall thickness.
- 02
Add a sheet per department
Tooling, temperatures, duration, tolerances, a safety note, a QC checkpoint and an ordered checklist.
- 03
Release the order
Each order line becomes job cards carrying the design's route. A department with no sheet is skipped.
- 04
Work the queue
Each department sees only its jobs and its sheet, ticks the checklist and records weight in, out and scrap.
- 05
Sign off
The next department unlocks, and every step is logged with who did it and when.
“Quench only after 20 minutes of air cooling - early quench cracks the hinge.”
The system holds the order of work.
Stages unlock in order
A department can't start a job until every earlier stage has been signed off.
Critical steps block sign-off
A stage can't be signed off while any checklist step flagged as critical is still unticked.
Loss traced to the stage
Weight in, weight out and scrap are recorded at every stage and loss % is calculated, so missing gold shows up where it went missing.
Reject with a reason
A supervisor can send a job back with a reason, which the previous department sees.
Versioned designs
Publishing a design saves a versioned snapshot, so every job card traces back to exactly what the floor was told.
Complete activity log
Every start, sign-off, rejection and reopen is recorded with who did it and when.
Built for planners, supervisors and the bench.
Department tools & settings
Each department lists its tools and the settings each one needs, such as Matt or High Polish, or a rhodium colour from a fixed list. Designs get the right fields and dropdowns instead of a blank text box.
Four clear roles
Admins write designs and instructions, planners release orders, supervisors run a department and sign off stages, and operators see only their own department.
Public lookup portal
Anyone can look up a design number and read its instructions without logging in, filtered by department and ready to print. Any design can require a PIN or be hidden.
Live department dashboard
Waiting, active and finished work for every department, plus open orders and jobs on the floor.
Read API & signed webhooks
An API-key-secured read API for kiosks and ERP screens, and signed webhooks when jobs are created, stages start, complete or are rejected, and jobs or orders complete.
Made for multi-department gold workshops.
Designed around workshops making 22K, 21K and 18K jewellery with karigar departments, from India to the Gulf. The demo workshop runs eight departments:
- 01CAD & Design
- 02Casting
- 03Filing & Assembly
- 04Stone Setting
- 05Polishing
- 06Plating
- 07Quality Control
- 08Packing & Dispatch
Connect it to your ERP. Or don't.
XAU Design works fully on its own. Connect it to Gold ERP on ERPNext and the ERP stays the main system for items, sales orders, karigars and the metal ledger, so gold is never counted twice.
- From the ERP: karigars become departments, items become draft designs and sales orders become orders
- Back to the ERP (optional, off by default): starting a stage drafts a Metal Issue, and signing off drafts a Metal Receipt chained to the next karigar
- Drafts wait for someone to review them in the ERP
- If the ERP is down the floor keeps working, and failed syncs are logged
- Runs as a single Docker container with SQLite, on your own server or on Railway, with a built-in backup command
Straight answers about XAU Design.

Put the instructions where the work happens.
Show us one of your designs and how it moves through your departments, and we'll show you what each bench would see in XAU Design.